Karns Valley Business Park (planned)

Size
Available
80Acres
-
Karns Valley Business Park (KVBP) will feature four to five development-ready sites on 80 acres with convenient access to ORNL and McGhee Tyson Airport

The Park is located in East Tennessee’s economic sweet spot, surrounded by East Tennessee’s highest concentration of technology-based companies, population and skilled workforce. It is centrally located between Oak National Lab (15 minutes) and McGhee Tyson Airport (20 minutes), downtown Knoxville (20 minutes) and the I-40/75 split (15 minutes).

With the completion of Karns Valley Drive , KVBP has near direct access to Oak Ridge Highway to the north. To the south, WestBridge Business Park provides access to Hardin Valley Road and Pellissippi Parkway/I-140.

View Photo Gallery

KVBP will be developed as a small, exceptionally attractive and desirable business park that will aid in the recruitment of companies and employees. A paved perimeter walking trail for exercise and recreational use by both business park employees and nearby residents is planned. Development standards will be in place to ensure superb overall quality in building and site design with abundant amounts of landscaping throughout.

Property Info
Covenants
Design guidelines are in place
Current Land Use
Developing business park
Maximum Elevation
1015′ (309m)
Minimum Elevation
980′ (299m)
Terrain Type
Gently sloped; Graded sites planned
Park Utilities
Line Size
Telecomm
-
Fiber Optics
-
Fire Protection
-
Distance To Fire Station
-
-
Transportation Accessibility
Closest Interstate
I-40; 5.0 miles (8 km)
Route To Interstate
Karns Valley Rd./Westcott Blvd. to Hardin Valley Rd. South on Pellissippi Parkway.
Barge Facility
Closest Rail Line
-
Rail Access
-
Closest Commercial Airport
Knoxville McGhee Tyson Airport (TYS); 16.9 miles (27.2 km)

Utility Overview

KVBP will be served by existing utilities that are either nearby or already on the business park property. Lenoir City Utilities Board maintains a large electric substation immediately adjacent to the site with sufficient capacity to power the Park. West Knox Utilities District (WKUD) has 24′ and 30′ water trunklines running through the perimeter of the development, and nearby sanitary sewer line will soon connect to a state-of-the-art wastewater treatment plant under construction along Melton Hill Lake. Natural gas is provided via an 8′ main that will be extended into the business park. KVBP will be well positioned to meet most any business’ utility needs.